Spurs V Real Madrid

Wembley Stadium

Lift first floor Slab

When there was a problem with suspended concrete slab Levels dropping after the famous arch was raised. E P Rothwell and Sons were asked to first prop and shore the unsupported areas.Hydraulic Jacking up the floors to the correct level. This was suscessfully completed using corderinated hydraulic Jacking to reduce stress on the structure

Stadium Walkways

When several sections of stadium walkway subsided during construction EPR provided heavy propping and hydraulic jacking and push pull propping with RMD Superslim soldier propping system to allow additional foundations to be underpinned. Our supervisor on this contract David Winter who is keen football fan really enjoyed this project

Please ring us on 01753-646012.