RMD Superslim Facade Retention and structural propping

Royal College of Pathologists

Design and monitoring.

We were appointed to carry out The Temporary Works Design.We conducted pullout tests to establish stength of existing brickwork. After which we set up a monitoring system to ensure that movement during demolition could be reduced. We then installed basement propping and back propping using RMD Superslim (slimshore) and RMD alshor plus systems this supported the vaults.We Designed a structural steel Needling section with a Gass prop system providing further shoring. basement propping was provided using Megashor flying shores.Plan bracing using RMD superslim completed the system.Basement shoring was enhanced with RMD Superslim soldier Raking props on external walls

A beautiful space was produced and we are proud to have been a part of that process

Please ring us on 01753-646012.