A beatuiful White stone church, This is quite rare

Propping St Johns Church Smith Square Westminster

During alterations E P Rothwell were instructed to provide a Temporary Works design and to erect a propping and shoring system, causing the minimum of disturbance.

Equipment Installed

We installed RMD superslim soldiers(slimshore)at high level grid the props were connected using RMD six way connectors. Alshor Plus shoring supported areas of ceiling. RMD Megashor was used on Facade retention and for heavy propping. Maybey masss 50 was used to provide Facade retention. With titan props and structural steel anchoring building at the higher level

This is truly a very beautiful church and we are proud to have worked on it.

Please ring us on 01753-646012.