read also the Tower of London article

Hampton Court Palace

Jubilee Celebration Memorial

E P Rothwell and Sons were very honoured when Hampton court approached us to design and install the reinforced concrete flower bed for Her Majestey the Queen's jubilee celibration. Formwork was supported using rmd Superslim soldiers (Slimshore) as well as Push pull props at 1.2 metre centres The project was successfully completed on time. Eamonn and Carmel Rothwell attended the opening ceremony and are most grateful for the momento from the Royal palace

Please ring us on 01753-646012.