Excavation continues Concrete works also constructed by E P Rothwell

Marchwood Incinerator

Basement Shoring, Stuctural Propping,and Concrete works

EPR are proud to have designed, and installed the shoring,RMD Superslim (slimshore) We also produced the Temporary works design for the concrete works and sucessfully completed the works on site. We also installed the heavy duty shoring which had to withstand considerable loads from adjacent ground as excavation proceeded.

We are honoured to be involved with this challenging Project.