Needling System protecting a beautiful coving

Structural Propping and Shoring W1 Basement

We were asked to produce a temporary works design, After completing the design we were appointed to install the heavy propping to the basement. We installed a row of RMD Superslim soldiers(Slimshores) walers which were capable of carring the high loads and allowed enough of a working area for the excavation. Whilst being able to fix these props without the use of a crane. Which is essential in restricted areas like this one. We then installed the raking props and eventually the Slimshore (RMD Superslim) flying props. This completed the upper layer of the Structural propping. Needling and Jacking were fixed also on this project.

Please call us to discuss your project on 010753-646012.