This system is carefully placed to avoid clashing with new floors

Facade Retention and corner bracing in RMD Superslim

Working in Partnership with RMD, E P Rothwell installed the various types of propping on this Architectural significant building.

There is a tower facade retention system on the South Side of the building. Along the north wall a rmd flying shore system is tied together with scaffold tubes. This system allows maxiumim space for the new construction process

East Wall

The east wall has RMD superslim corner bracing which is holding the building facade in postion. Almost all this project was constructed in RMD Superslim showing what a versatile product it is. We carefully designed the walings to avoid the new floors, enabling the main contractor to sucessfully achieve the tight programme.

We keep a large stock of many differant propping and shoring products for you to hire or we can provide a design supply and install package contract.

E P Rothwell are proud to be members of the Temporary works Forum (TWF)

Please call us for friendly advice on your project 01753 646012