Facade Retention, Structural Propping and Shoring Floral St Convent Garden

Facade Retention Ellmer Construction

Convent Garden Complex

As we were sucessfully completing the Carriage Hall project at the New convent Garden development, when Miles Emsley asked to create a Temporary Works Design for This challenging project. We installed Steel walers to the brickwork and working of the floors before demolition took place we were able place flying shores between them. RMD Super Slim (Slimshores) were used on higher levels.

Mabey mass 25 and Alshor Plus Propping and shoring were used on lower levels. This design produced a varied and very workable design. That allowed Ellmers generous working space as well as securing the Facade in place. E P Rothwell can design Facade Retentions for many differant situations if you require advice then please ring our office.

E P Rothwell proud members of the (TWF) Temporary works forum.