Temporary works, Structural propping, Needling,design and installation for R Collards Demolition
EPR are proud to have designed, supplied and installed the Stuctural propping and shoring, RMD Superslim (slimshore) propping Alshor Plus Shoring System up the both inside and outside of this prominant Building. EPR Produced a complex Temporary Works Design. Which had to change as the soft strip uncovered further challenges.
Equipment Details
Heavy Structual Propping was installed in basement using Alshor Plus and Megashore back propping systems.Facade Retention support was provided by RMD Superslim soldiers and RMD Alshor Plus installed on several floor levels.
Acrow props tied together with Scaffold tube bracing is fixed around openings, Mabey Mass 50 is used in certain key areas.
Special superslim (SlimShore) Bracing frames are needed to support the hollow rib steel floors,(See photo) Which had to be quickly designed and installed to match our client’s programme.
This was a very large Temporary works project taking 18 months total. At the End both Collard’s site manager John and contracts manager Martin Evans were very happy with our proformance this is the third project with R Collard.