Facade Retention Steel Frame, Structural Propping for ISG
Peterborough Shopping Centre Design ISG asked E P Rothwell to create a temporary works design for a steel frame and a Structural propping system. This needed to be done while the precinct remained open so the temporary works design had to account for this and allow for quick installation so

Facade Retention, Structural Propping and Needling at Baker House Uxbridge
Temporary works, Structural propping, Needling,design and installation for R Collards Demolition EPR are proud to have designed, supplied and installed the Stuctural propping and shoring, RMD Superslim (slimshore) propping Alshor Plus Shoring System up the both inside and outside of this prominant Building. EPR Produced a complex Temporary Works Design.

RMD Superslim Propping and Needling
Typical Needling System to hold up rear of house We produced a temporary works design for this project in North London, which as well as being cost effective allowed the builders good access to demolish the rear wall and extend out. We used RMD Superslim needling and we also used

Structural Propping The Tower of London
Tower of London Henry III’s Watergate bridge EPR are proud to have created the temporary works design,supplied and installed the RMD Superslim soldiers (slimshore)structural propping and the Alshor plus system supporting the Henry III’s bridge from the River Thames into the Tower of London. It has been in place for

Facade Retention, Propping and Jacking
Megashor Propping RMD Megashor was used to prop and lift the level of this car park, Using a megashor spanner we were able to lift the level of this car park 80mm, without the use of hydraulics. In the other picture Superslim is used as corner bracing,this method reduces the

Facade Retention, Structural Propping and Shoring Floral St Convent Garden
Facade Retention Ellmer Construction Convent Garden Complex As we were sucessfully completing the Carriage Hall project at the New convent Garden development, when Miles Emsley asked to create a Temporary Works Design for This challenging project. We installed Steel walers to the brickwork and working of the floors before demolition

Structural Propping Ellmers Phase Five, Convent Garden
Facade Retention, Needling and RMD Superslim Propping Facade Retention Propping and Needling System E P Rothwell were happy when Ellmers asked us to start our fifth contract with them at Convent Garden. We investigated the site and produced a temporary works design. Which we were able to start within days,

Facade Retention, Structural Shoring, Propping and Needling for R Collard’s Demolition
Facade Retention and Structural Propping Fulham Road London We had completed two sucessfull contracts for R Collard when we were then asked to continue our relationship with them. EPR Created a Temporary Works design that included a structual Steel Facade and Structual Steel Propping to a ground floor wall. this

Structual Propping & Shoring at Rushden Lakes for Winvic Construction
Structural Propping and Shoring for Winvic Construction Temporary Works Design and Erection of Alshor Plus shoring and Propping System. Winvic instructed E P Rothwell & Sons to design and install a Alshor Plus Tempoary works System to reduce the deflection in the Permanent steel beams during the concrete operations. Where

Propping
Propping Installation and Temporary Works design E P Rothwell and Sons install all types of propping, We can advise design supply and install all types of propping. We can hire the equipment to you to install if you so wish or you can use our skilled teams of erectors. Our

E P Rothwell & Sons News
E P Rothwell Propping and Facade Retention Ring us on 01753-646012.

Clivden House Swimming pool and Spiral Staircase
Clivden House Structual propping and Shoring Including Concrete works Stepping in at Short notice. We were asked to construct the garden swimming pool after the orginal contractor realised he could not construct the pool to the exacting tolerances. We took over and set out the area again. We produced temporary

Heavy Duty Basement Shoring
Heavy Propping Design and choice of correct equipment High loads in a basement, which is in a restricted location. We as a company are not restricted using to one method or system. MGF hydraulic props were picked and proved an excellent choice. In other areas of the site we used